Get early access to NVIDIA B200s

Reserve now

Elice AI PMDC

Custom AI data centers delivered in 3 months

Deploy complete modular data centers with integrated power, cooling, and security anywhere you need them

PMDC Container

Ready in 3 Months

Build and operate AI infrastructure in just 3 months, with efficient scaling capabilities to adapt to changing AI demands.


20-80kW High-Density Power

Industry-leading PUE of 1.27 delivers 55% better efficiency. Purpose-built for demanding AI training and inference workloads.


Up to 70% Cost Savings

Slash data center construction costs by up to 70% vs. traditional builds. Get enterprise AI infrastructure without the enterprise-grade price tag.

Flexible data centers without compromising performance

Traditional Data Center Limitations

18-24 month construction period

Generic infrastructure not optimized for AI

High construction and operating costs

Limited Capacity Expansion

Elice AI PMDC

Modular design enabling rapid deployment within 3 months

High-performance infrastructure optimized for AI

Simplified operations with integrated systems

Flexible capacity expansion by module

Flexible capacity expansion by module, both on-prem, hosted, or hybrid

Every part of the PMDC is specifically engineered for high-performance AI workloads

Space

Modular stacking structure enables more GPU servers in the same footprint


Deployment optimization tailored for AI-dedicated workloads


Up to 8x GPU density compared to general data centers (air-cooled, 1U server standard)

Based on 2-tier structure with liquid cooling vs. single-tier 1U servers, configured with 8 GPU servers per rack

Power

80kW support per rack

High-density operation of latest gpus including B200, H200


480kW+ of IT Load powers supply per liquied-cooled PMDC

Capable of operating up to 256 B200 GPU clusters


20%+ reduction in maximum power consumption

Maximum power consumption per rack: 15kWh → 12kWh

Cooling

Custom design for liquid-cooled / air-cooled systems

Cooling method selection based on budget and server performance requirements


Maximum power efficiency (PUE) of 1.1

Approximately 15% energy efficiency improvement with liquid cooling implementation


30°C reduction in average temperature

GPU average temperature stabilization in liquid-cooled environment

Pmdc solution packages

We provide AI infrastructure either standalone or integrated with ECI software based on your needs.

PMDC Only

Standalone hardware configuration selectable based on operational purpose

Model training

PMDC-R6-480-DLC

liquid-cooling

Max IT Load 480kW

Cluster-scale

4 x PMDC-R6-480-DLC

liquid-cooling

Max IT Load 1.92MW

Inference or mixed use

PMDC-R6-240-AC

air-cooling

Max IT Load 240kW

PMDC-HYBRID

Container options combination and customization available

Contact sales for PMDC

PMDC + ECI solution

Recommended

Integrated hardware and software package for AI system construction and operation

PMDC Hardware

AI workload-optimized containerized modular data center AI

ECI Software

Cloud IaaS platform optimized for AI workloads AI

GPU/NPU optimized VMs

Virtualize and utilize high-performance resources without performance degradation

Multi-tenant security isolation

Minimize security concerns with complete data separation

IaC tool integration

Support for automation environments including Terraform, OpenAPI

Turnkey solution

Integrated environment ready for operation immediately after PMDC installation

Support for various scale clustering

Stable scaling support in Infiniband, RoCEv2 environments

Learn more ECI
Contact sales for PMDC + ECI

Proven PMDC solution built by us, for us

Elice AI solutions powered by our own proven PMDC infrastructure

PMDC Solution

Elice internal deployment case

GPUaaS service launched from H100 PMDC built in 4 months

Using the PMDC + ECI turnkey solution, we launched GPUaaS services simultaneously with PMDC deployment. Provides a complete, ready-to-operate solution without additional development or complex integration work.

Construction period: 4 months (July-October 2024)

Configuration : H100-based PMDC containe

Results : GPU cloud service operation immediately after deployment

"Completed from purchase to operation in just 4 months. Built AI infrastructure with 1/3 the time and cost compared to traditional DC."

Elice Logo

Elice Infrastructure Team

Elice AI infrastructure built with global tech leaders

Partner 1
MOU signed for Elice Cloud AI PMDC construction
Partner 2
NVIDIA Deep Learning Institute (DLI) official education service partnership
Partner 3
Strategic cooperation MOU signed for the activation of the domestic AI semiconductor ecosystem
Partner 4
Joint development partnership established for next-generation Elice AI PMDC and cloud solutions

Trusted cloud solution for secure deployment from public to private sectors

Public service security certification

Meets mandatory security standards required by government agencies, enabling official adoption in public sector operations

For more information on CSAP based offering, please visit gov.elice.cloud (coming soon)


Global security standards

ISO27001 and ISO27701 certified, ensuring global enterprise-grade security compliance for all your data


Enhanced reliability

Built on years of proven expertise with rigorous verification processes that exceed industry standards

Certification 1
Certification 2
Certification 3

Start your scalable AI journey with Elice Cloud AI PMDC

Contact sales

Address: 433 Seolleung-ro, Gangnam-gu, Seoul, New Building 6F

CEO Kim Jae-won | Telecom Business Report No. 2022-Seoul Gangnam-04515 | Job Information Service Report No.: J1200020220004 | Business Registration No. 581-88-00303 | Phone 070-4633-2017 | Email contact@elice.io

GS 인증

Copyright ⓒ 2016 - 2025 Elice, Inc. All Rights Reserved.